Eartworks The packaging of the kit facilitates delivery and storage on the site. Because the structure is free-standing (no struts or reinforcements), the excavation extends only 15cm beyond the pool. More details
Installation of the structure The design of the structure and of the system by which the modular panels are assembled makes installation simple and rapid. The technical parts, the corners and the steps are pre-assembled and protected in the factory. The adjustment screws on the legs of each panel allow fine adjustment of the height and level. More details
Pouring of concrete When the positioning of the structure (levels and square) has been checked and adjusted, the welded wire netting placed on the bottom, and the reinforcement ties inserted in the holes provided for this purpose, C25/30 concrete is poured into the structure. More details
Finishing The swimming pools copings sit entirely on the wall of the structure without risk of subsidence. They are made to measure and do not require unsightly cutting. After cleaning, the floor is covered with felt and the walls and steps with a thick foam. More details
Fillinga Finally, the liner, made to measure in the factory (steps included), is attached to the liner lock built into the structure. More details